硬度范圍:35-90A
比重范圍:0.88-1.2
成型工藝:注塑成型
德創(chuàng)化工支持來樣定制個性化TPE/TPR/TPV/TPEE原料
" />

一性一交一口添一摸视频,国产片和外国大片,亚洲国产成人久久一区二区三区,亚洲精品成人无码中文毛片

ChineseEnglish

Hotline:138 2720 9711

  • 01
  • 02
  • 03

PRODUCT
PRODUCT CLASSIFICATION

Consultation hotline

138 2720 9711

INDUSTRY
INDUSTRY KNOWLEDGE

TPE material Your current location:Home > Product > TPE material

Instrument housing TPE coated ABS material

Contact 138 2720 9711

Product details

At 9:30 p.m. on April 10, 2020, I received a call from Mr. yang. Mr. yang is now making a PC/ABS material with TPE coating. since there are always bubbles in the product during the injection process, we found me through the internet. then we will make a brief analysis of the bubble problem in the forming of TPE coating. we often hear customers' reaction to the peeling of the gate or the peeling of the product during the injection process, especially when making rubber coating products. this phenomenon is especially serious. let's talk about the peeling, delamination, cracking, poor adhesion and other problems of TPE products. Cause Analysis of Bubble Delamination in TPE Coating Material; In this case, there are two reasons for the peeling and delamination of the rubber coating: 1. Compatibility of compounding system SBC-based TPE composites contain many components, which form different phase structures during blending and plasticization. Each phase structure aggregates into a whole by physical cross-linking network. However, insufficient compatibility of each phase separation will become the root cause of material delamination. 2. Forming Speed Shear Rate In some cases, too high a shear rate may lead to phase separation. In this case, the smaller gate size of the product for aesthetic purposes resulted in a higher TPE fluid shear rate at the gate position during injection molding. It is normal for TPE materials with poor compatibility to have peeling and delamination under the action of high shear rate. 3. Countermeasures Not only in this case, other TPE products have the same reasons and solutions for peeling and delamination during injection molding. (2) Strengthen the compatibility of TPE blending system; (2) During injection molding, the injection speed and pressure should be appropriately reduced to reduce shear friction; (3) Adjust the size and position of the glue inlet of the mold when necessary (for example, increase the size of the glue inlet appropriately).

Recommended products

Recommendation information

  • 2025-05-28
  • 2025-05-28
  • 2024-03-26
  • 2024-03-26
  • 2024-03-26
  • 2024-03-21
  • 2024-01-08
  • 2024-01-08

Dongguan Dechuang Chemical Co., Ltd.

DECHUANG

Contact number:138 2720 9711

Company address:Building B of Dajingjiu Plastic City, Changping Town, Dongguan City, Guangdong Province

主站蜘蛛池模板: 金阳县| 江陵县| 苗栗市| 繁峙县| 玉环县| 娱乐| 会昌县| 华坪县| 汤原县| 望江县| 绥德县| 东光县| 怀化市| 保山市| 东阳市| 巩义市| 沙坪坝区| 离岛区| 泰来县| 东阿县| 信宜市| 南部县| 甘孜县| 贵德县| 碌曲县| 湟中县| 波密县| 错那县| 雷波县| 南召县| 随州市| 肥城市| 上虞市| 沁水县| 游戏| 开远市| 万宁市| 莱西市| 平陆县| 哈密市| 辰溪县|